Industrial and Technical

Civils

£2.5m

NEC

25 weeks

Working on an existing partially developed location, we were contracted to provide infrastructure installations to facilitate the future development of the overall site. Following site clearance, the installation of roadways and drainage infrastructure was achieved in tandem with the ongoing development works.

Taking a site-wide and forward-thinking approach to the construction and design of this project was key in ensuring that works could be delivered with minimal disruption to existing operations, with an eye on the changing requirements of the site based on market demand.

Key Facts

0
m3 of recycled material used
0
m of storm drainage
0
m2 of permeable paving

With ecological constraints being key, our team worked through an evolving scheme to ensure that planning conditions were met without reducing the overall success of this project.

Working closely with the client and other stakeholders we utilised a flexible and collaborative approach which contributed to the ongoing success of the site-wide scheme as a whole. Our approach ensured the future-proofing of our client’s long term market requirements.