Residential

Construction and fit out

£750,000

JCT Design and Build

32 weeks

We were contracted to extend a retail development, adding a first floor to the existing building to construct and fit-out six apartments. The mixed-use development offered high-quality apartments.

The first phase of the project involved structural work and extending the superstructure in preparation for the installation of an additional floor. The second phase delivered construction and fit-out of the apartments ready for occupation.

Key Facts

0
2 Bed Apartments
0
Tonnes of Steel

We worked with the original design blueprint, developing it through the Design and Build contract model to ensure maximum return on investment for the developer, and ensuring the quality of finish specified was met.

The project included the production and installation of our own manufactured joinery products.

A critical success factor for this project was to ensure the two retail units below the apartments were able to trade for the entirety of the project duration, ensuring continuity for the businesses trading within the site.